roof, windows,doors, insulation and electrics


Just before the end of 2010 we received photos of the guys putting the roof tiles
on.
At the start of 2011 the weather hadn't been the best, it had been cold, frosty and above all there
had been more rain. With the machine churning up the soil it had turned the land into a quagmire........... YUK
The
rooflight windows were fitted into the roof and the windows and doors were also installed, then the interior really started
to take shape .......watch this space for more photos.
| Jean laying the roof tiles 28.12.10 |

|
| View from over the wall |

|
| Jan & Dave |

|
| fitting the roof window |

|



| Roof window fitted at the bac |

|
| fitted insulation in the grenier |

|
| rolls of insulation to be fitted |

|
| Grenier from the inside |

|
| From living room towards kitchen |

|
| Bedroom |

|
| Living room & entrance |

|
| Spaghetti junction-bathrooms |

|
Things are moving faster than we expected, it was a surprise to see
they had started to do the first fix electrics, the grenier insulation is complete and with the recent bad weather it will
prove there are no leaks and that they are true artisans who are doing the work.
| plenty of storage in the grenier |

|
| partitions between shower rooms |

|
| the chambre |

|
| artisan at work |

|
| looking up in the living room |

|
| looking up from the living area |

|
| looking to the grenier |

|
| bedroom en-suite |

|
| looking into the shower rooms |

|
| kitchen,living room & dining room |

|
| temporary stairs to the grenier |

|
| the chambre |

|
|